Bathroom & Wet Room Installation

Bathrooms, en-suites and wet rooms — tanked properly, drained properly, ventilated properly. The waterproofing you can't see is the part that decides whether the finish lasts.

Detail

Tanking is not optional

The single most common bathroom failure we're called to remedy is water tracking through a shower area into the structure below. It rarely announces itself for a year or two, and by the time it does the floor is usually the problem rather than the tiles.

A shower enclosure or wet room needs a continuous waterproof layer behind the tile — a liquid membrane or tanking board system, dressed into the tray or the graded floor, with the corners and pipe penetrations detailed properly. Tile adhesive and grout are not waterproof, and a tile is not a membrane.

In a wet room the floor itself becomes the drainage surface, which means a former or a graded screed falling to a linear or point drain, tanked across the whole floor and up the walls. It is more work than a tray, and it is the part of the job worth spending on.

Scope

What a bathroom project includes

  • Strip-out and structural check of the floor, particularly on upper floors and where a bath is being moved
  • Soil and waste alterations, with falls checked rather than assumed
  • Water supply, pressure assessment and pump where the incoming pressure won't serve the shower specified
  • Tanking to shower areas, wet rooms and any splash zone
  • Underfloor heating and floor build-up, coordinated with the drainage
  • Electrical work to bathroom zones, IP ratings and RCD protection, certified under Part P
  • Mechanical extract ventilation, ducted externally and sized to the room
  • Tiling, stone, sanitaryware, brassware and fitted joinery
Practicalities

Pressure, position and ventilation

Three things determine whether a finished bathroom is actually good to use, and none of them appear in a mood board. The first is water pressure: a rainfall head and body jets on an unvented system with insufficient flow will disappoint every morning, and the fix is far cheaper designed in than retrofitted.

The second is drainage position. Moving a WC any distance from the existing soil stack is the constraint that most often reshapes a layout — there's a limit to how far you can run at the required fall before a pumped solution is the only answer.

The third is ventilation. A properly sized extract fan, ducted to outside rather than into a loft void, running on an overrun timer, is what prevents the mould that otherwise appears within two winters.

Good to Know

Bathrooms — common questions

A same-layout replacement is typically 2–3 weeks. Moving the WC, forming a wet room or altering the floor structure usually makes it 3–5 weeks. Tanking and screeds have curing times that can't be rushed, which is often what people underestimate.

Usually yes, but the floor structure has to be checked first — a graded screed adds weight, and a linear drain needs depth within the floor build-up. On a traditional timber floor it's very often achievable with the right former; on some spans it needs the joists strengthening.

Electrical work in a bathroom is notifiable under Part P, and ventilation is covered by Part F. Adding a new bathroom where there wasn't one, or altering drainage, brings in more. A like-for-like replacement with no new circuits generally doesn't, but the electrical certification still matters.

A mechanical extract fan ducted to the outside, sized for the room and ideally on a humidity sensor or overrun timer. Venting into a loft void rather than through the roof or wall is common in older installations and causes condensation problems above the ceiling.

Browse all FAQs
Start your project

Request a quote for your project

Answer a few quick questions and the team will be in touch shortly.

Request a Quote≈ 60 sec
Step 1 of 617%

What type of project are you planning?

Takes about 60 seconds
WhatsAppCall Now